Products
: Formdex Uni |
Back
|
 |
TOILET BLOCKS |
|
TREATMENT TO
CONCRETE DEFECTS LIKE
CONSTRUCTION JOINTS COLD JOINTS,
HONEY COMBS & POROUS CONCRETE:
All construction joints, honey
combs, cold joints, after
casting shall be treated by
hacking open the affected area
to sound concrete, fixing
nozzles and grouting the same,
under pressure with cement
slurry mixed with plasticizer,
and non shrink additive. |
|
TREATMENT TO
SUNK SLAB (FLOOR):
The waterproofing material to be
used shall be Formdex Uni. It is
a cementitious, two-component,
polymer-modified, heavy duty
slurry waterproofing membrane.
Cleaning the surface for
treatment by removing dust, dirt
etc by wire brushing & water
jetting. Providing and carrying
out FORMDEX UNI two component
polymer based, cementitious
water proofing treatment to
Toilet slab in two coats brush
applied and reinforcing with
chopped strand fiber glass mat
at upturns and around detailings.
(Measurement shall be as per
actual area treated). |
|
TREATMENT TO
SUNK SLAB (WALLS):
The waterproofing material to be
used shall be Formdex Uni. It is
a cementitious, two-component,
polymer-modified, heavy duty
slurry waterproofing membrane.
Cleaning the surface for
treatment by removing dust, dirt
etc by wire brushing & water
jetting. Providing and carrying
out FORMDEX UNI two component
polymer based, cementitious
water proofing treatment to
verticals of sunken areas &
walls up to 2.0 mtrs (in shower
area) and 1.0 mtr (in other
areas) from finished floor level
in two coats brush applied and
reinforcing with chopped strand
fiber glass mat at upturns and
around detailing. (Measurement
shall be as per actual area
treated). |
|
PROTECTION
AND SUNK FILLING TREATMENT:
Providing, mixing and laying for
protection and sunk filling
brick bat coba up to a depth of
200 mm. |
(TO BE
PROVIDED BY THE MAIN CONTRACTOR) |
|
 |
|
|
|
|
|